In the Summer of 2010, Smith HVAC won the bid to start and complete the removal of one old 5 ton rooftop AC unit and replace with a new 5 ton rooftop unit. The Job was located at 121 East 62nd Street N.Y. N.Y. The Bulgarian Consulate General. See photos below. For reference call Stochev at (212) 935-4646 |
|
|
 |
|
|
Old 5 ton unit is removed from its base atop two I-beams and detached from existing duct. |
|
|
|
 |
|
|
 |
|
|
|
New unit is delivered to job, by truck/Crane. |
|
|
|