St. Joachim & Anne Combind Heat and Power Plant. 2720 Surf Avenue Brooklyn, New York 11224. Hydroelectric/hydronic shop drawings of mechanical room.
Underneath Power Plant mechanical Room
Pier 53 Firehouse N.Y. N.Y., First floor plumbing shop drawing (gas, sanitary, and domestic water.) Responsible for floors 1-4
Pier 53 Firehouse N.Y. N.Y., Electrical shop drawings (this PDF file has two drawings side by side) First floor service room and third floor deck conduit layout shop drawings. Responsible for floors 1-4
to view photo of Pier 53 Firehouse construction
New York City Transit (MTA).   Replacement of boilers at Amsterdam Bus Depot.  Piping and boiler shop drawing. Responsible for floors 1-2  Summer of 2010.
1891 East 2nd Street Brooklyn N.Y., Architectual shop drawings. Responsible for floors cellar-to 2nd and exterior. Spring 2011
to see cellar and First Floor
Brooklyn Technical College Brooklyn N.Y., (Welcome Center). Sprinkler shop drawing. Spring 2011